Repository navigation
{2026.06}[GCCcore/15.2.0,foss/2026.1] Graphviz 15.1.0, gnuplot 6.0.5, libgd 2.3.3, GTS 0.7.6, Guile 3.0.11, GLM 1.0.3, Lua 5.5.0, SOCI 4.1.4, Bazel 7.7.0, OpenMM 8.5.2, p7zip 17.05 - #1774
Conversation
… libgd 2.3.3, GTS 0.7.6, Guile 3.0.11, GLM 1.0.3, Lua 5.5.0, SOCI 4.1.4, Bazel 7.7.0, OpenMM 8.5.2, p7zip 17.05
|
bot: build repo:eessi.io-2026.06-software instance:eessi-bot-mc-aws for:arch=x86_64/amd/zen4 |
|
New job on instance
|
|
New job on instance
|
casparvl
left a comment
There was a problem hiding this comment.
- Please bump to use EB 5.4.1 so that from-commit is no longer needed for
gnuplot. - I have converted this to 'draft' until the p7zip has been merged upstream. Our policy is that we only deploy into EESSI once the PR in upstream EB is accepted. If you notice the upstream PR is merged, please update the from-commit to the merge commit, then take this out of draft.
…d p7zip to EB 5.4.1 easystack EasyBuild 5.4.1 ships these easyconfigs, so from-commit is no longer needed for gnuplot. p7zip 17.05 is not the 5.4.1 recipe (easybuild-easyconfigs#27186 is still open) and keeps its from-commit pin.
…26.1.yml Update to merge commit for p7zip
|
bot: build repo:eessi.io-2026.06-software instance:eessi-bot-mc-aws for:arch=x86_64/amd/zen2 |
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
Edit: I had another risc-v failure as well, I think we filled up some disk... going to check size of trash bin and clean... |
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
New job on instance
|
|
bot: build repo:eessi.io-2026.06-software instance:eessi-bot-riscv-prod for:arch=riscv64/generic |
|
New job on instance
|
|
Ok, this thing is not going to fly for |
|
bot:status last_build |
|
This is the status of all the
|
8 similar comments
|
This is the status of all the
|
|
This is the status of all the
|
|
This is the status of all the
|
|
This is the status of all the
|
|
This is the status of all the
|
|
This is the status of all the
|
|
This is the status of all the
|
|
This is the status of all the
|
|
Staging PR merged |
Adds Graphviz-15.1.0-GCCcore-15.2.0-minimal, gnuplot-6.0.5-GCCcore-15.2.0, libgd-2.3.3-GCCcore-15.2.0, GTS-0.7.6-GCCcore-15.2.0, Guile-3.0.11-GCCcore-15.2.0, GLM-1.0.3-GCCcore-15.2.0, Lua-5.5.0-GCCcore-15.2.0, SOCI-4.1.4-GCCcore-15.2.0, Bazel-7.7.0-GCCcore-15.2.0-Java-21, OpenMM-8.5.2-foss-2026.1, p7zip-17.05-GCCcore-15.2.0 to 2026.06. Recipes after the EasyBuild 5.4.0 release are pinned with from-commit to their merge commit on develop.